Chapter 4: Management with WebPAM PROe
93
Until date from the dropdown menus.
For Redundancy Check, choose,
Auto Fix option – Attempts to repair the problem when it finds an
error. Check to enable
Pause on Error option – The process stops when it finds a non-
repairable error. Check to enable
Select LD – Check the boxes for the logical drives to run
Redundancy Check. Check at least one logical drive
6. Click the Save button.
Enabling or Disabling a Scheduled Background Activity
Background activity schedules are enabled by default when you create the
schedule. If you want to stop a background activity now but plan to use it again in
the future, disable the scheduled activity rather than deleting it.
To enable or disable change an existing scheduled background activity:
1. Click the AdminTool tab.
2. Click the Background Activities icon.
The list of background appears.
3. Click the Scheduler button.
The list of currently scheduled background act it viti es appears.
4. Mouse-over the background activity and click the Settings button.
5. Uncheck the Enable This Schedule box to disable this schedule.
Check the box to enable this schedule.
6. Click the Save button.
Deleting a Scheduled Background Activity
To change an existing scheduled background activity:
1. Click the AdminTool tab.
Caution
Disabling the battery recondition schedule is NOT recommended.
Caution
Deleting the battery recondition schedule is NOT recommended.