Promise Technology VTrak VTM310i Manuál Strana 110

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 262
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 109
VTrak M310p, M210p Product Manual
102
Manual Rebuild
If a physical drive has failed, identify and replace the drive, then rebuild the disk
array as described below:
1. Click the Subsystem icon in Tree View.
2. Click on the Disk Arrays icon.
3. Click on the Disk Array icon.
If there are multiple disk arrays, choose the icon with the yellow !.
4. Click on the Background Activities tab in Management View.
5. Click the dropdown menu on the Background Activity tab and select Start
Rebuild.
6. Select the Source physical drive.
This is a remaining functional physical drive in the disk array.
7. Select the Target physical drive.
This is the replacement physical drive.
8. Click the Submit button.
The Disk Array Background Activity tab will show the rebuild on the replacement
(target) physical drive. Depending on the size of the physical disk involved, this
process will take some time.
To view more information, click on the Rebuild on PDx link.
To set Rebuild priority, see “Change Background Settings” on page 50.
Disk Array Background Activity
The Disk Array–Background Activity tab provides information about functions that
run in the background on your subsystem:
Disk array Migration
Disk array Rebuild
Predictive Data Migration (PDM)
Spare drive Transition
Start Background Function
To start a background function:
1. Click the Subsystem icon in Tree View.
2. Click on the Disk Arrays icon.
3. Click on the Disk Array icon.
4. Click the Background Activities tab in Management view.
Zobrazit stránku 109
1 2 ... 105 106 107 108 109 110 111 112 113 114 115 ... 261 262

Komentáře k této Příručce

Žádné komentáře