To shutdown the RAID subsystem:
1. From the Main Menu, highlight Additional Info and Management and press
Enter.
2. Highlight Shutdown or Restart and press Enter.
3. Highlight Option and press the spacebar to display Shutdown.
4. Highlight Submit and press Enter.
A warning message appears.
5. Press Y to continue.
6. Close your SSH session.
7. Wait for no less than two minutes.
8. Manually turn off the power supply switches on the back of the subsystem.
Shutting down the VTrak – Serial Connection
This function shuts down the VTrak subsystem on a serial connection. Additional
action is required, as described below.
To shutdown the RAID subsystem:
1. From the Main Menu, highlight Additional Info and Management and press
Enter.
2. Highlight Shutdown or Restart and press Enter.
3. Highlight Shutdown or Restart and press Enter.
4. Highlight Option and press the spacebar to display Shutdown.
5. Highlight Submit and press Enter.
A warning message appears.
6. Press Y to continue.
7. Turn off the power supply switches when you see the following message:
Shutdown complete. It is now safe to power off the subsystem.
Important
If you have a JBOD Expansion, always power off the RAID
subsystem first. Then power off the JBOD subsystems.