VTrak E-Class Product Manual
334
Stripe Level migration is
queued
Migration has been set manually or by schedule.
Synchronization
Synchronization is started Result of settings or user action. Normal.
Synchronization is
completed
Normal.
Synchronization is
paused
Synchronization paused because of user
intervention, schedule or higher priority background
activity.
Synchronization is
resumed
Synchronization has resumed again after a pause or
a reboot.
Synchronization is
stopped
Synchronization stopped because of user
intervention, schedule or the logical drive was deleted
or went critical or offline.
Synchronization is
aborted due to an internal
error.
System resources are low. Reduce system load or
restart the VTrak. See page 119 or page 245.
Synchronization is
queued
Synchronization is already running on another logical
drive in the same array.
Synchronization is
stopped internally
Synchronization stopped because the disk array was
deleted or removed.
System (VTrak)
The system is started The VTrak has been started.
The system is stopped The VTrak was shut down.
Transition
Transition is started Result of settings or user action. Normal.
Transition is completed Normal.
Transition is paused Transition paused because of user intervention,
schedule or a higher priority background activity.
Transition is resumed Transition has resumed again after a pause.
Transition is stopped Transition stopped because of user intervention or
the logical drive was deleted.
Transition was switched
to rebuild
Transition changed to rebuild because the logical
drive went critical.
Reported Event Corrective Action